The project anticipates the construction of 2 PV farms with 60,5 MW capacity in Tokmak area
The first PV plant with 6 MW capacity was built in 2013 and operational since 2014 in Nove, Tokmak district, Annual production at 7,5GWh with green FIT
60,5 MW Tokmak (largest operational PV project in Ukraine) was commissioned in 2018 and is fully operational on 100 hectares landplot. The project has own HV substation for 150KV built and owned by developer
Construction period February2017–October2018
+15MW expansion on site is ongoing that will allow to increase annual production from 68GWh to 85GWh
Equipment suppliers for the project are the top industry manufacturers: Sharp, Risen, Talesun, Fronius, ABB
Unique technical solutions were applied during the construction process, in particular, the so-called “trackers” (sunflower type) – the company’s own development, patented in Ukraine
Previous
Next
FOTON ENERGY
17,4MW PV project operational from December 2018 near Pidgorodne, Dnipro region
Annual production is 22GWh with green FIT at 0.15 Euro
Project located on 26 hectares land plot owned by the company
Start of construction – June 2018, commissioning – December 2018. The project has been selling power to the grid from the 1st January 2019. Project executed within 122 days from start
Grid connection executed at 35KV with own MV substation; underground grid line built +4 km
Core suppliers to the project: Risen, ABB, Metinvest, ZTR, Odeskabel
Previous
Next
SOLEN ENERGY
Solar power plant with 23,37MW generating capacity, 28.4GWH electricity production per year
36 hectares land lease for 10 year period. Location – Zaporizhia, Orekhovskiy highway
Start of construction – September 2018, commissioning – April 2019. 35kV connection to 150/35kV grid operator substation with 1km line
Main equipment: – 2V RISEN (poly, 1500VDC) + ABB(PVS-120-TL)
Selling to the grid at green FIT from 1st June
Core suppliers to the project: Risen, Longi, ABB, Metinvest, ZTR, Odeskabel
PE NACPROD
Solar power plant with 22.8 MW generating capacity, 30 GWH electricity production per year
33,3 hectares land lease for a 49 years period. Location – Zaporizhia region, Vasilyevsky area, Malobelozersky local council
Start of construction – September 2018, commissioning – April 2019. 35kV connection to 150/35kV grid operator substation with 3.1 km line
Main equipment: -2V RISEN (poly,1500VDC) + ABB(PVS-120-TL)
Selling to the grid at green FIT from 1st July 2019
Core suppliers to the project: Risen, ABB, Metinvest, ZTR, Odeskabel
BROAD SOLAR PARK
Solar power plant with 23,4MW generating capacity, 29GWH electricity production per year
36 hectares land plot is owned. Location – Zaporizhia area, Shirokovskiy local council
Start of construction – September 2018, commissioning – April 2019. 35kV connection to 150/35kV grid operator substation with 6km line
Main equipment: – 2V RISEN (poly,1500VDC) + ABB(PVS-120-TL)
Selling to the grid at green FIT from 1st June 2019
Core suppliers to the project: Risen, Longi, ABB, Metinvest, ZTR, Odeskabel