GREEN ENERGY TOKMAK

  • The project anticipates the construction of 2 PV farms with 60,5 MW capacity in Tokmak area
  • The first PV plant with 6 MW capacity was built in 2013 and operational since 2014 in Nove, Tokmak district, Annual production at 7,5GWh with green FIT
  • 60,5 MW Tokmak (largest operational PV project in Ukraine) was commissioned in 2018 and is fully operational on 100 hectares landplot. The project has own HV substation for 150KV built and owned by developer
  • Construction period February2017–October2018
  • +15MW expansion on site is ongoing that will allow to increase annual production from 68GWh to 85GWh
  • Equipment suppliers for the project are the top industry manufacturers: Sharp, Risen, Talesun, Fronius, ABB
  • Unique technical solutions were applied during the construction process, in particular, the so-called “trackers” (sunflower type) – the company’s own development, patented in Ukraine

FOTON ENERGY

  • 17,4MW PV project operational from December 2018 near Pidgorodne, Dnipro region
  • Annual production is 22GWh with green FIT at 0.15 Euro
  • Project located on 26 hectares land plot owned by the company
  • Start of construction – June 2018, commissioning – December 2018. The project has been selling power to the grid from the 1st January 2019. Project executed within 122 days from start
  • Grid connection executed at 35KV with own MV substation; underground grid line built +4 km
  • Core suppliers to the project: Risen, ABB, Metinvest, ZTR, Odeskabel

SOLEN ENERGY

  • Solar power plant with 23,37MW generating capacity, 28.4GWH electricity production per year
  • 36 hectares land lease for 10 year period. Location – Zaporizhia, Orekhovskiy highway
  • Start of construction – September 2018, commissioning – April 2019. 35kV connection to 150/35kV grid operator substation with 1km line
  • Main equipment: – 2V RISEN (poly, 1500VDC) + ABB(PVS-120-TL)
  • Selling to the grid at green FIT from 1st June
  • Core suppliers to the project: Risen, Longi, ABB, Metinvest, ZTR, Odeskabel

PE NACPROD

  • Solar power plant with 22.8 MW generating capacity, 30 GWH electricity production per year
  • 33,3 hectares land lease for a 49 years period. Location – Zaporizhia region, Vasilyevsky area, Malobelozersky local council
  • Start of construction – September 2018, commissioning – April 2019. 35kV connection to 150/35kV grid operator substation with 3.1 km line
  • Main equipment: -2V RISEN (poly,1500VDC) + ABB(PVS-120-TL)
  • Selling to the grid at green FIT from 1st July 2019
  • Core suppliers to the project: Risen, ABB, Metinvest, ZTR, Odeskabel

BROAD SOLAR PARK

  • Solar power plant with 23,4MW generating capacity, 29GWH electricity production per year
  • 36 hectares land plot is owned. Location – Zaporizhia area, Shirokovskiy local council
  • Start of construction – September 2018, commissioning – April 2019. 35kV connection to 150/35kV grid operator substation with 6km line
  • Main equipment: – 2V RISEN (poly,1500VDC) + ABB(PVS-120-TL)
  • Selling to the grid at green FIT from 1st June 2019
  • Core suppliers to the project: Risen, Longi, ABB, Metinvest, ZTR, Odeskabel